Murphys Shade Structure

Published

We recently completed a shade structure that compliments the deck and shed. The project started back in June; despite a few complications, it was a ton of fun to work on!

The completed shade structure. For reference, here is a photo of the original setup.

Started in June 2020

Sienna came up with the idea after suffering through a few visits to Murphys in the dry summer heat.. The project was born when she found a free metal awning on Nextdoor.

Collecting the awning from Walnut Creek, June 2020
Original sketch of the design, drafted by Sienna 🙂

Complications..

The assembly process was “enlivened” by the presence of many unforeseen complications. Everything from transporting 14ft beams across counties, to the deck not running parallel to the edge of the shed, to corners being inaccessible on a ladder! Here are a few of the highlights..

Materials

Our original specs called for 14ft beams to lay horizontally and support the metal roof material. We didn’t foresee how fun it would be to transport these long 2x4s up to the property from out home in Pleasanton.

Not exactly street legal..

Even after finding long 2x4s, we still needed to extend one of them. After experimenting with a few different end-to-end joins, I decided to use 4 pocket screws. I continue to be impressed by their tight hold, but do worry about them snapping under stress.

Deck Irregularities

We originally planned to attach the vertical 2×4 posts directly onto the side of the deck. We realized after attaching the posts that the deck was 10ft wide at the far side of the shed, and closer to 11ft at the nearside..

Needed to move the front-left post closed to the shed; metal roof only stretched 10ft!

While it was time consuming, it was pretty fun to determine the correct position for the post. I created a little prop to help.

Moving the post onto the deck would allow the metal roofing to reach

Finally we attached the post to the deck using a combination of strong-ties (I could only find deck post fasteners for 4x4s.. maybe that’s suggesting something 🙂 ).

Let’s hope it holds!

Difficult Corners

Turns out the far corner of the deck had a diagonal that made it very difficult to stand on a ladder and put in screws. Thankfully we inherited a 4-section ladder from Sienna’s dad that helped tremendously.

Smoke in the background from wildfires 150 miles away..

We also had a hard time attaching the roofing in the back corner, and I ultimately ended up adding a second horizontal 2×4 for some more nailing surface.

Completed in October

What we thought would be a quick project nailing some 2x4s together sprawled into several puzzles that had to be solved (ones we didn’t sign up for!!).

The structure seems pretty sturdy, and casts good shade mid-day. We’ll see how long it lasts, and more importantly: how long before we start making modifications 😉

Follow Our Progress

Enter your email address to be notified about news, projects, and updates related to our Murphys property.


Comments

Loading comments..

No responses yet

Leave a Reply

Your email address will not be published. Required fields are marked *